Southbound UP Loaded Coal Train at the BNSF Crossing  Contributor's Pick!       
After easing up to the gate, UP Train 2CNAAE 27 stops at the BNSF crossing shortly after a BNSF Train had passed by. We arrived 1 hour and 45 minutes and 14 miles after I got on at Parma. This would turn out to be the last time I shot a train on this particular stretch of the New Madrid Sub.
Date: 4/30/2005 Location: Lilbourn, MO Views: 535 Collection Of:   Zach Pumphery
Locomotives: UP 8201(SD9043MAC) UP 7515(AC60CW)    Author:  Zach Pumphery
Southbound UP Loaded Coal Train at the BNSF Crossing
Picture Categories: This picture is part of album:  April 2005 in SEMO
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=554298