Two or three dips and the tie is firm against the rail. After the entire curve is done a slow order will be placed on this segement of track & after a few trains have passed the track will be checked for level again. Generally with new stone & tamping the track is quite stable and shows very little movement... /DL |
Date:
9/28/2014 |
Location:
Walkersville, MD Map ![Show Walkersville on a rail map](/images/map_us.gif) |
Views:
100 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
|
Author: David Larrabee
|
![Tamping](http://s3.amazonaws.com/rrpa_photos/104956/50%20IMG_3939%20(2).JPG) |
Picture Categories: Track |
This picture is part of album: Curve #10 at MP 7.5 |